Published on March 6, 2024

Invitation to initial selection for Waste-to-Energy plant in the port of Barbados

Barbados Port Inc. (BPI) has received a loan from the Inter-American Investment Corporation (IDB Invest) towards the cost of the Construction of a Waste to Energy Facility (WTE). 

The WTE is for the treatment of ca. 800 cubic metres - 4,500 cubic metres of waste per month where such waste comes from cruise ships and port with an
indicative completion period of 18 months including commissioning. 

More details are provided via the link below.